Prod Model: |
DN15-1200 |
Lead Time: |
7days or Depend The Qty of The Order |
Warranty Time: |
12months |
Applications: |
Petroleum, Chemical, Power, Gas, Metallurgy, Shipb |
MOQ: |
1PC |
Type: |
Equal |
Connection: |
Welding |
Material: |
Carbon Steel |
Shape: |
Equal Tee |
Lateral: |
90??Tee |
Head Code: |
Round |
Wall Thickness: |
SCH80 |
Finish: |
Black Painting |
Technics: |
Forged |
Standard: |
ANSI |
Certification: |
CE |
Pressure Rating: |
None |
Product Description
carbon steel equal tee for petroleum chemical machinery
Type | Tee |
Size | Seamless Tee:1/2"~24" DN15~DN600 Welded Tee: 1/2"~100" DN15~DN2500 |
Wall thickness | sch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, sch120, sch140, sch160, xxs, std,sch5s, sch20s, sch40s, sch80s |
Standards | ANSI, ASTM,DIN, JIS, BS, ISO, GB, SH, AND HG etc |
Material | Carbon steel: ASTM A234 WPB,WPC, ASTM A105 Alloy steel: ASTM A234 WP1-WP12-WP11-WP22-WP5-WP91-WP911 Stainless steel: ASTM A403 WP 304-304L ASTM A403 WP 316-316L ASTM/ASME A403 WP 321-321 Low-temperature steel: ASTM/ASME A402 WPL 3-WPL 6 High performance: ASTM/ASME A860 WPHY 42- 46- 52- 60- 65- 70 |
Surface treatment | Transparent oil, rust-proof black oil or hot galvanized |
Packing | wooden case, pallet or as customers' requirement |
Applications | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc |
Min order | 1 piece |
Delivery time | 7 after receipt of advanced payment |
Certification | API, ISO9001:2000 |
Delivery Term | FOB(30% down payment in advance, the balance before shipment) CIF or C&F(30% in advance , the balance against with the copy of B/L) |
1.COMPANY DETAILS
2.PRODUCT PICTURES
3.PRODUCTION EQUIPMENT AND INSPECTION EQUIPMENT
4.PRODUCT PACKAGING AND SHIPMENT
FAQ
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T, D/A, D/P, Western Union (can be) could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have API, ISO, Gost,
3: What about the delivery time?
A: 7days after receiving the order.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occuts first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs
My details is as the follows ,if you have any inquiry ,please send me ,i will reply you as soon as possible
ADD: YALONG GARDEN, FENGSHOU ROAD, SHIJIAZHUANG CITY ,
HEBEI PROVINCE ,CHINA, 050000
Web:http://www.beihaipipe.com
Tel :+86-311-89685169 ;+86-15303215556
Fax :+86-311-67902569
:15303215556
BEIHAI Pipe Group, founded in 1997, covers an area of 6, 800 square meters. We mainly produce Steel Pipe Fittings & Flanges. And we also have very good cooperative factories for Steel Pipes. The main materials Including Carbon Steel, Stainless Steel and Alloy Steel. The standards are ASME, JIS, GOST, DIN, BS, and we can also produce non-standard products according to customers' drawing.
We started International Business from the year 2009, up to now, we have customers over 30 countries.
In Europe: The United Kingdom, Italy, France, Russia, Slovakia etc.
In Asia: Indonesia, Singapore, Vietnam, Bangladesh, Malaysia, the Philippines, UAE, India, Pakistan, Thailand, Oman, Turkey, Kuwait etc.
In North America: The United States etc.
In South America: Peru, Mexico etc.
In Africa: Ghana, South Africa, Nigeria etc.
In Oceania: Australia etc.
We have got good reputations from our clients for our excellent products and good service. We are excepting to cooperate with customers all over the world.