tool-buy

Home Toolbuy Products Casting Kitchen Hardware Accessories with Zinc/Zamak

Casting Kitchen Hardware Accessories with Zinc/Zamak

Casting Kitchen Hardware Accessories with Zinc/Zamak
Price: US $ 0.5-3/Piece
Trade Terms: FOB,CIF
Min Order: 2000/Piece
Pay Type: T/T
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Surface: Zinc/Chrome Plating, Sandblasting, Painting, Anod
Process: Die Casting
Raw Material: A380\ADC10\ADC12 Zinc Zamak3, Zamak5
Weight: 0.5-15 Kgs
Length: Max 800mm
Design: as Per Customers' Drawing and Samples
MOQ: 1000PCS Die Casting Parts
Date: 2/3 D Die Casting Drawings
Application 2: Decoration/Construction Hardwares Furniture Hardwa
Raw Material 2: Zamak Zinc Castings
Material: Zinc Alloy
Surface Preparation: Electroplating

Product Description

We are casting parts manufacturer in China
We cater quality, we cater service, we also cater price.

Quality, Credit, Service are our necessary keys to success.
Ningbo Laishun Metalwork Co., Ltd was established in 2000, We are an ISO-9001:2008, SGS audited professional manufacturer and exporter in various parts, components and accessories, hardwares in China. We can supply all kinds of casting, aluminum alloy, zinc/ zamak alloy die casting parts, investment casting, lost wax casting, sand casting, gravity casting
Design software, analysis software, processing software: CAD(AutoCAD, solidworks, ug, pro/e )/CAE/CAM.
Equipments: Please email us to get the equipment list
Our main products:
Lighting components, electronic equipment housing and accessories, auto parts, motorcycle parts, pump parts, locomotive parts, machinery parts tool parts, decoration/construction hardwares furniture hardware, window hardware/ door hardwares, locks hardwares, bathroom Hardware, ect
Our customers: We have been manufacture various parts, components and accessories as per our customers' samples or 2/3D to European, American successfully for 15 years, Such as Electrolux, CHG ,TOTO, ASSA , philips are all our customers
Raw material: A380,A383,ADC10,ADC12,ENAB44100,ENAB46100,ALSi9Cu3 aluminum alloy, zamak 3 , zamak 5 zinc alloy etc, stainless steel, grey iron, ductile iron, carbon steel,brass/copper etc
Manufacture Process:
1)Process: Die Casting/sand casting/gravity casting/ lost wax casting/ forging
2)Secondary Machining: CNC turning, milling, drilling, grinding, assembly to Packing
3) Surface Finish: zinc/Chrome plating, sandblasting, painting, anodizing, powder coating, electrophoresis, PVD ect.
Why choose us ?
1. Credit first, reasonable price, and what we offer to customers is the qualified products, as well as good service, on-time delivery.
2. Our strong R&D and QC department can control the products to meet your strict requirement. 100% according to your drawings and your samples.
We offer the engineer consultation to your design for production improvement and cost saving. We can provide packing according to your specific requirements.
3. Your inquiry will quickly reply within 24 hours.
4. ISO 9001:2008 Certified, SGS audited manufacturer. Own factory, direct factory price. You can skip trade company, then you will have greater competitiveness and profit space for your products.
5. Non-standard/standard/OEM/ODM/customized service provided.
6. Confidential service: Your information is confidential. Your drawings are confidential.
Your products are only for you
Where we are
Ningbo Laishun Metalwork Co., Ltd is located in Wuxiang Industrial park, Ningbo, Zhejiang, China. The traffic is very convenient, it next to Shanghai Hangzhou Ningbo high-speed beltway Wuxian Dingjiashan exit, and close to Ningbo sea port and Ningbo air port,
How do I order?
What is the payment terms?
T/T;  L/C at sight ; western union; Paypal;
50% deposit for pre-production, paid the balance before shipping.
It can be negotiable
What is the regular products'leading time?
The samples time is about 30-35days, when we get the 50% the tooling charge from you,
we begin to make the tooling, the tooling finish, we make the samples.
When the samples finish, then we send you the samples.
 It will take about 30-35 days to finish the orders after you confirm the samples.
How to inquiry us ?
Send us the 2/3 D drawings by email, if no drawings, send the samples to us.
We will send you the official quotation in 24 hours after get 2/3 D drawings.
SALES DEPARTMENT: 
Lily Wu
Mobile: +86 18958181568
hardware component
cabinet hardware
door hardware

 
We are an OEM manufacturer of casting parts in China
We cater quality, we cater service, we also cater price.

Quality, Credit, Service are our necessary keys to success.

Ningbo Laishun Metalwork Co., Ltd was established in 2000, We are an ISO-9001:2008, SGS audited professional manufacturer and exporter of various casting parts, components and accessories, hardwares in China.

We can supply all kinds of casting, aluminum alloy, zinc/ zamak alloy die casting parts, investment casting, lost wax casting ,sand casting, gravity casting.

Staff No.:Over 150 skilled staffs including 20 technologists and 15 QC
The construction area:6,500 square meters
Design software, analysis software, processing software:CAD(AutoCAD, solidworks, ug, PRO/e )/CAE/CAM.

Equipments:Please email us to get the equipment list

Our main products:

1, Lighting components, Electronic equipment housing and accessories, auto parts, motorcycle parts, pump parts, locomotive parts, machinery parts, tool parts etc

2, All kinds of hardwares
1) Decoration/Construction/architectural hardwares
2) Furniture hardware furniture fittings
3 )Window hardware/ door hardwares, locks hardwares
Such as custom pull handles, custom drawer handles, window handles, door handles, hinges, cylingders, door bolts, legs and other hardwares
4) Refined sanitary products/hardwares/ Bathroom Hardware

Our customers:We have been supplying various parts, components and accessories as per our customers' samples or shop drawings or blueprints to European, American and Asian market successfully for 15 years, Such as Electrolux, CHG ,TOTO, ASSA , philips are all our customers.

Raw material:A380,A383,ADC10,ADC12,ENAB44100,ENAB46100,ALSi9Cu3, aluminum alloy, zamak 3 , zamak 5, zinc alloy etc, all kind of steel, stainless steel, etc

Manufacture Process:
1)Process:Die Casting/sand casting/gravity casting/ lost wax casting/ forging
2)Secondary Machining:CNC turning, milling, drilling, grinding, assembly to Packing
3) Surface Finish:Zinc/Chrome plating, sandblasting, painting, anodizing, powder coating, electrophoresis, PVD etc.

Why choose us ?
1.Credit first, reasonable price, and what we offer to customers is the qualified products, as well as good service, on-time delivery.
2.Our strong R&D and QC department can control the products to meet your strict requirement.100% according to your drawings and your samples.
We offer the engineer consultation to your design for production improvement and cost saving.We can provide packing according to your specific requirements.
3.Your inquiry will quickly reply within 24 hours.
4.ISO 9001:2008 Certified, SGS audited manufacturer.Own factory, direct factory price.You can skip trade company, then you will have greater competitiveness and profit space for your products.
5.Non-standard/standard/OEM/ODM/customized service provided.
6.Confidential service:Your information is confidential.Your drawings are confidential.
Your products are only for you

Where we are
Ningbo Laishun Metalwork Co., Ltd is located in Wuxiang Industrial park, Ningbo, Zhejiang, China.The traffic is very convenient, it next to Shanghai Hangzhou Ningbo high-speed beltway Wuxian Dingjiashan exit, and close to Ningbo sea port and Ningbo airport.

What is the payment terms?
T/T;L/C at sight ;Western union;Paypal;
50% deposit for pre-production, paid the balance before shipping.
It can be negotiable.

How to inquiry us ?
Send us the 2/3 D drawings by email, if no drawings, send the samples to us.
We will send you the official quotation in 24 hours after get 2/3 D drawings.

What is the regular products' leading time?
The samples time is about 30-35days, when we get the 50% the tooling charge from you,
We begin to make the tooling, the tooling finish, we make the samples,
When the samples finish, then we send you the samples.
It will take about 30-35 days to finish the orders after you confirm the samples.

Send your message to this manufacturer

  • Ningbo Laishun Metalwork Co., Ltd.

More >

You May Like

About Us Toolbuy Products Toolbuy Manufacturers Hot Toolbuy Toolbuy News Toolbuy Trade Shows Site Partners Contact Us Sitemap